Installation Tips and Guidelines: A. Measure the height of your plenum space from the sub-floor to the bottom of the stringer. Note: Horizontal scores are spaced 1" apart. Example: If raised floor height measures 10-1/2" high, separate PLENAFORM baffle at 11" and flex material for a snug fit.
B. Separate PLENAFORM
baffles at desired height.
(Note: the rivets are not a Phillips head even though they
look like it.) Estimated time to install a 24" high 50 ft. run: 2 people x 2 hours * * actual times may vary depending on sub-floor conditions It's a snap to install! |
|
|
|
||
![]() |
![]() |
|
|
|
||
![]()
Installation tip: pre-stage and pop-outs rivets prior to removing any floor tiles by aligning baffles with the floor grid (don't forget to allow for the 1-1/2" overlap of baffle joinery).
|
![]()
Even the most difficult penetrations by conduit, cables and power feeds can be accommodated.
Installation tip: Pre-stage baffle cutouts in congested areas prior to placing under the floor. Patch smaller sections in difficult situations.
Where cables, conduit, fiber trays, seismic bracing, etc. extend through baffle, cut out with scissors as closely as possible to allow passage.
|
|

© 2007-2008 COMPUSPACE LC All rights reserved. U.S. and Foreign Patents Pending
The contents of this web site may not be reproduced in any media without the the express written permission of CompuSpace LC. Updated Sept. 9, 2008
Home |
PlenaForm |
PlenaFill |Assembly Instructions |
Applications
| Data Center
Cooling |
Parts List |
Hot-Cold Aisles
Terms and Conditions |
Privacy
Policy